Skip to main content
Logo GMV

Main navigation

  • Sectors
    • Icono espacio
      Space
    • Icono Aeronáutica
      Aeronautics
    • Icono Defensa y Seguridad
      Defense and Security
    • Icono Sistemas Inteligentes de Transporte
      Intelligent Transportation Systems
    • Icono Automoción
      Automotive
    • Icono Ciberseguridad
      Cybersecurity
    • Icono Servicios públicos Digitales
      Digital Public Services
    • Icono Sanidad
      Healthcare
    • Icono Industria
      Industry
    • Icono Financiero
      Financial
    • Icono Industria
      Services
    • All Sectors

    Highlight

    Slopsquatting
    Slopsquatting: A silent threat born from the hallucinations of LLMs
  • Talent
  • About GMV
    • Get to Know the Company
    • History
    • Management Team
    • Certifications
    • Corporate Social Responsibility
  • Communication
    • News
    • Events
    • Blog
    • Magazine GMV News
    • Press Room
    • Media library
    • Latest from GMV

Secondary navigation

  • Products A-Z
  • GMV Global
    • Global (en)
    • Spain and LATAM (es - ca - en)
    • Germany (de - en)
    • Portugal (pt - en)
    • Poland (pl - en)
    • All branches and all GMV sites
  • Home
  • Communication
  • News
Back
New search
Date
  • Space

Bepi Colombo, on the way to Mercury

22/10/2018
  • Print
Share
Bepi 0

At 01.45 GMT (03.45 CEST) on 20 October the BepiColombo mission was successfully launched atop an Ariane 5 rocket from the European Spaceport of Kourou (French Guiana).

BepiColombo, a joint mission of the European Space Agency (ESA) and the Japanese Aerospace Exploration Agency (JAXA), comprises a Mercury Transport Module (MTM), built by ESA, and two independent orbiters, ESA’s Mercury Planetary Orbiter (MPO), nicknamed “Bepi”, and JAXA’s Mercury Magnetospheric Orbiter (MMO) or “Mio”. These have inbuilt solar panels, electrical propulsion systems, several antennae and a complex thermal management system. All these tools have been designed to withstand Mercury’s harsh environment.

ESA’s Mercury Planetary Orbiter (MPO), fitted with 11 instruments, will basically map Mercury’s surface, taking high-resolution images and analyzing the makeup of the soil (unknown hitherto) and the magnetic field. JAXA’s Mercury Magnetospheric Orbiter (MMO), for its part, octagonal in shape and covered in mirrors, carries four instruments to study the magnetic field and look for dust particles while also analyzing Mercury’s thin atmosphere, the exosphere.

One of the biggest challenges facing this mission is the sun’s huge gravitational pull, which will hinder a stable orbital insertion of the spacecraft around Mercury, calling for more energy than sending a spacecraft to Pluto. After the launch, once outside the Earth’s “gravity well”, BepiColombo will then have to brake continually against the sun’s gravitational pull. MTM’s ion thrusters, built by ESA, will supply the necessary low thrust during the long cruise phase, using technology previously put through its paces in ESA’s GOCE mission for studying the earth’s gravity and the SMART-1 mission to the moon. 

Bepi Colombo is due to reach Mercury in 2025. One year later its science operations will begin, possibly then lasting for two years. The scientific data will be collected by ESA’s receiving antenna in Cebreros, Ávila, and then sent on to ESAC, Madrid, where it will be processed and distributed to the researchers. The spacecraft’s instructions will be sent up from the European Space Operations Centre (ESOC) in Germany.

Within the mission GMV has developed the Control Center for ESA’s European Space Operations Centre, including operational support during the launch phase. It has also designed the Science Ground Segment (SGS) for the European Space Astronomy Centre (ESAC). Another notable activity has been development of the orbital control system in association with operational support during the launch and routine phases, including the complex transfer phase until the satellite is successfully inserted into Mercury orbit. During the initial phases, under the aegis of ESOC, GMV also helped out in the necessary mission analysis activities for designing the whole ensemble of this interplanetary exploration mission. Lastly, GMV has led various important studies for defining the system and the relative navigation algorithms used onboard the satellites.

Bepi Colombo is Europe’s first ever mission to Mercury, the smallest and least explored planet of the inner solar system. It is also the first to send two orbiters to take simultaneous and complementary measurements of the planet’s dynamic environment.

Before going into Mercury orbit Bepi Colombo has a seven-year voyage ahead of it, during which time it will perform nine planetary flybys, the Earth once, Venus twice and Mercury six times. This means the mission will not only tell us more than we ever knew before about the innermost planet of our solar system but also, on a broader scale, will give us priceless insights into the evolution of such systems in general, gleaning invaluable information on the formation and development of planets orbiting close to their progenitor stars in exoplanetary systems.

  • Print
Share

Related

satelite
  • Space
GMV renews its contract with the French Space Agency for the maintenance and evolution of the BAS3E space surveillance simulation system
debris
  • Space
GMV wins a contract with ESA to study the orbital neighbourhood of a space mission
egnos-program
  • Space
GMV strengthens its relevance in the EGNOS program with the SDAF Project

Contact

Europaplatz 2
64293 Darmstadt | Deutschland
Tel. +49 6151 3972 970
Fax. +49 6151 8609 415

Zeppelinstraße, 16
82205 Gilching | Deutschland
Tel. +49 (0) 8105 77670 150
Fax. +49 (0) 8105 77670 298

Contact menu

  • Contact
  • GMV around the world

Blog

  • Blog

Sectors

Sectors menu

  • Space
  • Aeronautics
  • Defense and Security
  • Intelligent Transportation Systems
  • Automotive
  • Cybersecurity
  • Digital Public Services
  • Healthcare
  • Industry
  • Financial
  • Services
  • Talent
  • About GMV
  • Shortcut to
    • Press Room
    • News
    • Events
    • Blog
    • Products A-Z
© 2025, GMV Innovating Solutions S.L.

Footer menu

  • Contact
  • Legal Notice
  • Privacy Policy
  • Cookie Policy
  • Impressum

Footer Info

  • Commitment to the Environment
  • Financial Information