date:
texto pequeño texto mediano texto grande
soluciones GMV

 

MISSION PLANNING and scheduling

In the existing context, where systems are increasingly complex and budgets and resources are increasingly tighter, mission planning systems have become highly necessary to manage available resources and optimize their use.

In response to market needs, GMV provides mission planning systems that support the entire planning process in a highly configurable, flexible, adaptable, and extensible manner for easy maintenance and operation.

GMV provides these either as turnkey systems developed according to specifications supplied by customers with specific needs or systems based on the configuration of flexplan, our COTS mission planning generic product purchased by space agencies ESA and NASA for several of their missions.

Our mission planning systems are developed to support different system operations and perform different complete satellite, on-board instrument and ground center/resource tasks.  These systems are currently used in different mission types, such as satellite-based and UAV mixed platform types, as well as earth observation, weather, military, and transport type missions.

The generic nature of the planning systems developed by GMV makes them ideal to apply to any resource planning issue, not only on-board and space industry types, but also non-on-board resources and those from different industries where resource planning is vital for the enhanced management of resources.

A typical development may include all or a subset of the following features, as per user requirements:

  • Requirements Consulting
  • Specification
  • Design
  • GMV Products Configuration and Adaptation
  • Software Development
  • Hardware Procurement
  • Implementation
  • Adaptation and Customization
  • Verification and Validation
  • Customer Site Installation
  • Existing System Integration
  • Master Plan Generation
  • User-Scenario-Based Event and Task Creation
  • Conflict Resolution
  • Algorithm Generation
  • Event and Plan Generation
  • Intuitive User-Friendly Graphic Interface
  • First and Second Line Maintenance
  • Provision of Configuration Control Systems and Maintenance Management
  • 24/7 On-Call Support
  • Education and Training

 

Icono Space

Noticias

First test of the WSO-UV mission
First test of the WSO-UV mission
02-15-2010
The first simultaneous demonstration of the coordinated control operation of the World Space ...
leer mas  + info

COROT Extends the Exoplanet Search for another Three Years
COROT Extends the Exoplanet Search for another Three Years
12-14-09
COROT (standing for: COnvection ROtation and planetary Transits) ...
leer mas  + info

Galileo Applications in Emergency Situations
Galileo Applications in Emergency Situations
12-07-09
GMV has taken an active part in Spain’s demonstration of the European MAGES ...
leer mas  + info

 

GMV